Blue rolling tool cabinet with casters and multiple drawers
Home/Rolling Tool Cabinets

Rolling Tool Cabinets, Built to Your Specification

Ball-bearing slides, central locking and rated casters as standard options — with the drawer layout, colour and worktop you specify.

Location
Qingdao, China
Core Line
AMADA CNC
Business
OEM / ODM
Shipment
FOB Qingdao
01
20,000+ m²Manufacturing floor in Qingdao.
02
75+ MachinesLaser, turret punch, press brake, welding robots.
03
80+ StaffProduction team on the line since 2016.
04
IATF 16949Automotive quality system, e-coat and spray line.
Configuration

What you can specify

A rolling cabinet is usually the piece that gets handled most, so the details matter: how the drawers are laid out, how the unit locks, and how it rolls across a workshop floor.

  • Cabinet width, depth and height
  • Drawer count and drawer heights
  • Ball-bearing slides and load rating
  • Central locking or per-drawer locks
  • Casters: fixed, swivel or braked
  • Worktop: steel or stainless steel
  • Push handle and side panels
  • Colour — any RAL
Worktop tool cabinet with push handle, side view
Production

Built on the same line as the rest of the range

Punching runs on an AMADA AE2510NT CNC turret punch with MP2512L automatic sheet loader, nesting straight from your DXF. Parts then move to CNC press brake, robotic and MIG welding, the automatic powder-coat line and final assembly.

One point of contact in Qingdao from your drawing to the loaded container. Pre-shipment inspection is against the confirmed drawing, and you can send your own inspector or use SGS / BV.

    Cabinet assembly on the production line in Qingdao
    How It Works

    From Your Idea to Container

    You approve at every gate. Nothing is cut before the drawing is signed off, and the render and the technical drawing cost you nothing.

    01

    Your Requirement

    Send a sketch, a measured layout or a reference photo. Sizes, drawer counts, colour, locks and casters.

    02

    3D Scene Render

    We build a virtual scene image of the cabinet before anything is made, so you can see the proportions.

    2 working days
    03

    Technical Drawing

    The layout is locked and issued as a formal DXF / PDF drawing with dimensions, steel gauge and bill of materials.

    2 working days
    04

    Sample Build

    One sample unit is built and photographed, or shipped, for your final approval.

    7-10 days
    05

    Mass Production

    Punch, bend, weld, powder-coat and assemble on the line, with photo updates at the key stages.

    30 days
    06

    QC & Shipping

    Pre-shipment inspection against the confirmed drawing, then export packing and container loading.

    30-45 days total
    Build Options

    From Our Production Line

    Units built on the Qingdao line — not stock photography. Bring your own drawing or a reference photo and it will be built to that.

    Rolling tool cabinet on casters
    Rolling tool cabinet on casters
    Worktop chest with push handle
    Worktop chest with push handle
    Tool chest, side view
    Tool chest, side view
    Assembly, Qingdao
    Assembly, Qingdao
    Quality System

    Automotive-Grade Quality System

    Our factory holds IATF 16949:2016 — the automotive quality system — and produces stamped and welded metal parts with electrophoretic and spray coating for a German premium car maker. The same plant, the same stamping, welding and coating processes go into your cabinets. The certificate is in cycle 3 and runs to July 2029.

    ISO 9001:2015 is also held (manufacture of metal structural products, first certified 2018). The IATF certificate covers automotive part manufacturing at the plant; product design and drawings are handled by our own engineering team.
    FAQ

    Buyer Questions

    Do you also supply top chests?

    Yes. Top chests, intermediate chests and rolling cabinets can be quoted as a matched set, in the same colour and the same drawer styling.

    Which slides and casters do you fit?

    Ball-bearing drawer slides and rated casters are standard options. Heavier slides, specific caster models and braked casters can be specified in the drawing.

    Can the drawer layout be changed?

    Yes. Drawer count, drawer heights and internal divider layout are set from your drawing or from a layout you mark up on our 3D render.

    What is the lead time?

    3D render and technical drawing: 2 working days each (free). Sample: 7-10 days. Mass production: about 30 days. Total from inquiry to container shipment: 30-45 days.

    Also On The Same Line

    Other Product Lines

    Contact

    Get a Quote Within 24 Hours

    Send a drawing, a rough sketch or a photo of what you need. Tell us the destination port and the quantity you have in mind — you get a firm number, a lead time and photos of comparable builds.

    Contact
    Stephen Liang · Managing Director
    Tel / WhatsApp
    Address
    No.6 Building, Shui Qing Hua Yuan,
    Chengyang District, Qingdao, China
    Send Inquiry