Steel rolling cabinet built for export
Home/Freight Terms, Duty & GST

FOB or CIF — Who Pays Duty and GST?

Three terms, one page: what FOB, CIF and a delivered-duty-paid shipment each include, who pays what, and why the import clearance is best handled on the importer's side. Our published term is FOB Qingdao.

Location
Qingdao, China
Core Line
AMADA CNC
Business
OEM / ODM
Shipment
FOB Qingdao
01
20,000+ m²Manufacturing floor in Qingdao.
02
75+ MachinesLaser, turret punch, press brake, welding robots.
03
80+ StaffProduction team on the line since 2016.
04
IATF 16949Automotive quality system, e-coat and spray line.
The Terms

Three terms, in one line each

Incoterms describe where the seller's cost and risk stop. The three that come up in every cabinet enquiry:

  • FOB Qingdao — we deliver the goods into your forwarder's hands at Qingdao; you control the freight from there
  • CIF your port — we add the ocean freight and cargo insurance to the port you name
  • Delivered duty paid — the seller clears the goods in your country, which makes the seller the importer of record, with duty and GST in their name
FOB Qingdao is our published term. Other terms are quoted per project.
Steel cabinets and crates before shipment
Who Pays What

The charges that sit past the port

Dealing with the forwarder and the customs broker is ordinary work; the trap is the difference between the risk a buyer and a supplier can each carry. Under any delivered arrangement the seller is guessing at local charges that only the destination market really knows — and a guess is paid for by the buyer, one way or another.

  • Ocean freight and insurance: per the term you choose
  • Terminal handling and, for LCL, the destination CFS charges — per shipment, not per cubic metre
  • Customs entry and any duty: the importer
  • GST on import — 10% in Australia — is payable by whoever clears the goods
  • Delivery from the port to your site: the importer
Packed steel cabinets on pallets
A Practical Route

One number, from a company that knows the ground

Ask the forwarder at your end for a door-to-door rate, and we will hand the goods to them at Qingdao. You then have one landed cost, quoted by someone who knows what clearance, GST and delivery actually cost where you are — instead of a foreign supplier's estimate.

  • We quote FOB Qingdao and deliver into your forwarder's hands
  • Your forwarder quotes door-to-door, including clearance and GST
  • LCL and full container are both quoted so the choice is visible
Export packing and loading area
How It Works

From Your Idea to Container

You approve at every gate. Nothing is cut before the drawing is signed off, and the render and the technical drawing cost you nothing.

01

Your Requirement

Send a sketch, a measured layout or a reference photo. Sizes, drawer counts, colour, locks and casters.

02

3D Scene Render

We build a virtual scene image of the cabinet before anything is made, so you can see the proportions.

2 working days
03

Technical Drawing

The layout is locked and issued as a formal DXF / PDF drawing with dimensions, steel gauge and bill of materials.

2 working days
04

Sample Build

One sample unit is built and photographed, or shipped, for your final approval.

7-10 days
05

Mass Production

Punch, bend, weld, powder-coat and assemble on the line, with photo updates at the key stages.

30 days
06

QC & Shipping

Pre-shipment inspection against the confirmed drawing, then export packing and container loading.

30-45 days total
Build Options

From Our Production Line

Units built on the Qingdao line — not stock photography. Bring your own drawing or a reference photo and it will be built to that.

Modular storage system ready for export
Modular storage system ready for export
Steel cabinet, powder-coated finish
Steel cabinet, powder-coated finish
Workshop floor, Qingdao
Workshop floor, Qingdao
Quality System

Automotive-Grade Quality System

Our factory holds IATF 16949:2016 — the automotive quality system — and produces stamped and welded metal parts with electrophoretic and spray coating for a German premium car maker. The same plant, the same stamping, welding and coating processes go into your cabinets. The certificate is in cycle 3 and runs to July 2029.

ISO 9001:2015 is also held (manufacture of metal structural products, first certified 2018). The IATF certificate covers automotive part manufacturing at the plant; product design and drawings are handled by our own engineering team.
FAQ

Buyer Questions

Do you ship delivered duty paid?

That would put us in the position of importer of record in your country, with the duty and GST liability in our name. We quote FOB Qingdao as standard, and price other terms per project.

Why not just quote me a door-to-door price?

Because we would be estimating charges that belong to your market — and an estimate that is too low is not a favour, it is an invoice waiting to happen. A forwarder at your end quotes those numbers from daily experience, and we deliver into their hands at Qingdao.

What is the difference between FOB and CIF in money terms?

CIF adds the ocean freight and cargo insurance to your port; FOB stops at Qingdao. For a single system the ocean leg is only part of the landed cost — destination handling and clearance are usually the larger unknowable.

Can you load LCL and a full container?

Both. One system is typically 8–9 m³ crated, comfortably LCL; two or three systems together start to favour a 20 ft container.

What is the lead time?

3D render and technical drawing: 2 working days each (free). Sample: 7-10 days. Mass production: about 30 days. Total from inquiry to container shipment: 30-45 days.

Also On The Same Line

Other Product Lines

Contact

Get a Quote Within 24 Hours

Send a drawing, a rough sketch or a photo of what you need. Tell us the destination port and the quantity you have in mind — you get a firm number, a lead time and photos of comparable builds.

Contact
Stephen Liang · Managing Director
Tel / WhatsApp
Address
No.6 Building, Shui Qing Hua Yuan,
Chengyang District, Qingdao, China
Send Inquiry